BAMBOOS

School kitchen for Phum Steung Primary School

Project category School infrastructure
Project type School kitchen project
School name Phum Steung Primary School
Location Bakong District, 25 km from Siem Reap City
Students 414 students (201 girls, 213 boys)
Teachers 16 teachers (15 female, 1 male)
Implemented by Kamboo Team
Funded by Swiss kitchen designer, planner and builder Andres Küchen Langenthal
Project value USD 2,500
Implementation year 2024
Students reached 414 students (201 girls, 213 boys)
Project status ✓ Completed

Project description

The challenge

The school’s kitchen had long been a critical issue due to its age and deteriorating condition. It was poorly maintained, with a leaking roof, insufficient seating and inadequate provisions for safe and hygienic meal preparation – a real risk to the health and well-being of the rural children who rely on the school for their daily meals.

Our solution

We renovated the existing kitchen facilities. The roof was repaired to stop leaks, the sitting area was expanded to give the children more space at mealtimes, the cooking area was modified with proper ventilation so smoke can escape, and a secure storage space was created to protect cooking materials from weather damage and theft.

The impact

The kitchen is now dry, safer and more hygienic, giving the children a more comfortable place to eat and a healthier cooking environment. Further support is still needed to fully realise the potential of the project and ensure long-term benefits.

Made possible by

We are most grateful to our sponsor, Swiss kitchen designer, planner and builder Andres Küchen Langenthal.

Picture gallery

Scroll to Top